Hello OM,
I'll try to explain better.
To pull this off you should have defined following:
1) a putaway strategy for the specific storage type, because if there is none, system will wait for user input.
2) Storage type search sequence we can use *** to search the whole WH.
3) Defined SUTs.
4) OMM1 Assigned SUTs to the storage type.
Let's say we have WH 001, STs 001 and 002, SUTs 01 (box of 6 pcs) and 02 (box of 8 pcs) and 03 (box of 12 pcs) and material A. I want to put 6 pcs to ST 001 and 8 and 12 pcs to ST 002.
1) Both STs have defined strategy for putaway let's say "B".
2) Storage type search sequence is set for the whole WH by putting *** in transaction OMLY.
3) I have defined SUTs 01, 02 and 03 in OMM1 under WH 001.
4) In OMM1 I defined SUTs I assign to WH 001 as follows:
WH | ST | SUT 1 | SUT2
001 | 001 | 01
001 | 002 | 02 | 03
This setting will give me the chance to sor material by it's SUT because if you choose SUT which is not allowed in the destination ST, system will not allow the transfer.
With regards,
Michal