Hi Ravi,
I've tried with your possible solution however nothing change. On proposal the value date continue with the date: 26.01.2016
![]()
![]()
How is possible to control value date? It seems like SAP system is ghatering the value date from another side. I'm lost my mind with this.
Thanks again!!!